Evaluating tourist villages and projects

Floating hotels

Preview waste disposal methods.

Review of the body's structural system.

Review the driving forces, payment methods, and direction.

Review and follow-up of navigation devices (marine - river).

Preview of kitchen and restaurant equipment and supplies.

Review navigation certificates for the vehicle (age - construction year - navigation licenses).

Review licenses and economy class. (Nile floating units, marine floating units).

Tourist villages

Structural ratios

Review of licenses and engineering drawings

Review all project components from


  • Land, buildings, and constructions
  • Network and infrastructure works
  • Landscape work
  • Furniture and furnishing work
  • boiler work ..
  • cookware work.
  • Satellite, internal radio, and sound system work
  • Swimming pool and operating room works
  • Reviewing the time implementation rates
  • Working capital and operational needs
  • Review of compatibility of equipment and availability
  • Air conditioning works (central, units, split, window)

Evaluation of machinery, equipment and production lines


Production Lines

Procedures

Production capacity.
Inventory, revision, and description.
Maintenance and operation programs.
Determination of validity and depreciation rates.
Availability of main components and accessories.
Documentary review (invoices, fees, added expenses).


Industrial sectors

Reviewing the facility's industrial licenses.
Review machines and equipment
(mixers, mixers, mixing units, paper production units, "initial stages",
chemical additives).
.


Machinery and Equipment

Inspection, review and classification of machinery and equipment.
Physical examination of production lines and determining their suitability and compatibility with the quality of production.
Review of machines and auxiliary equipment, equipment and means of transport and internal handling Review periodic and preventive maintenance equipment.
Examine and review general service lines.

Evaluation of various projects (applied cases)


Spinning / Weaving Factories

Spinning mills

Review the facility's industrial licenses.
Reviewing the quality of machines and equipment for producing cotton / polyester yarn.
Reviewing the cotton yarn factories in terms of the presence of cotton lightening units - cotton substitutes - Kurdish units - drawing units - spinning machines (open ends, closed ends).

Textile factories

Review of twisting units - warp yarn work units - assembly units - textile machinery and equipment (looms) in terms of technologies (dobby - jacquard - waterjet W.JET)

Hospitals

Documentary Review of Quality and Specialization.
Reviewing devices, equipment and supplies.
Review of operating rooms, their contents and extent of isolation from the surrounding atmosphere Revision of Critical Case Units (I.R)
Review the ability to perform rapid operations (one-day operations)
Review the ambulance units and their suitability.
Inspection of ventilators and gas supply units for operations.
Review recovery rooms and residence rooms.
Review infrastructure and amenities.

Evaluation of production projects (agricultural and animal)

Animal and dairy production farms

Main Production Wards.
Feed mixer / water supply equipment.
Incubations
Milking tanks and units.
Dairy Volumes.
Automatic care and control systems.


Poultry and egg production farms

main breeding wards.
HVAC works.
Cell cooling units.
Feed production units.
Eggs pallets.
Main Feeding Fountains and Primers.

Hatchery equipment and hatcheries.
Cages and their components.
Transports equipped with refrigeration units.
Infrastructure works, water, electricity.
Female feeding units and male feeding units (pods).


Farms and agricultural crops

Draw different samples.
Perform an internal examination.
Reviewing and applying standard specifications according to the type of crop.

Evaluating Stored Goods and Stores

Follow-up of industrial and commercial projects under construction

Procedures followed

Feasibility study review.
Conduct periodic visits.
Review the schedule, implementation rates and completion rates.
Review and approve the abstracts according to the implementation work.
Review of licenses and engineering drawings Research and study the contractors' ability to implement
Conformity of implementation works in terms of technical specifications according to the conditions mentioned in the tenders.
Review the compatibility of the terms of the exchange of the loan with the terms of the project's investment costs.
Follow up the project practice to purchase the assets related to the project's equipment

Become our partner


Psum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate
cursus a sit amet mauris. Morbi accumsan ipsum velit.

Go to contact